8.6 Steps and slopes on paths
How steep a gravel path can be before it washes out, and how to build simple steps of stone or timber filled with gravel where it is steeper.

At a glance
- Difficulty
- 3 of 4
- Time
- 1 day for 5 steps
- Tools
- Spade, mattock, tape, spirit level, string line, hand tamper, sledgehammer, drill for pins
- Parts
-
- 1 Footing
- 2 Fill
- 3 Tread
How steep
| Slope | Ratio | What to build |
|---|---|---|
| up to 5 % | 1:20 | Any path in this chapter. |
| 5–8 % | 1:20–1:12 | Self-binding gravel or DG (8.2, 8.3) in short lengths, with level rests; not loose gravel. |
| 8–10 % | 1:12–1:10 | Very short lengths, or paving. Gravel washes out. |
| over 10 % | steeper than 1:10 | Steps, or a path that zigzags across the slope. |
Crossfall: about 2 %, and at most 1 in 40 (2.5 %) on the path to a front door. Measure the slope as height ÷ length × 100.
What you need per step, 1 m wide
| Material | Size | Type | Amount |
|---|---|---|---|
| Footing | 0–32 mm | Crushed, with fines, tamped | 0.02 m³ |
| Fill behind the riser | 0–32 mm | Crushed, with fines, tamped in layers | 0.05 m³ |
| Tread surface | 0–8 or 0–11 mm | Self-binding gravel (8.2), 50 mm | 35 kg |
| Riser | – | Large flat stone, sleeper or treated timber, with pins | 1 |
Why easy steps or trail steps?
Garden and house steps. UK guidance for the path to a front door: rise 75–150 mm, going (tread depth) at least 280 mm. Easy for everyone, so use these near the house.
Trail steps on steep ground. US Forest Service: rise 150–200 mm, tread 250–300 mm, and twice the rise plus the tread about 635–686 mm.
Step by step
-
1
Measure the height and length of the slope.
Divide the height by about 150 mm for the number of steps; divide the length by the number of steps for the tread. Check: twice the rise plus the tread should come to about 635–686 mm. If the treads come out very long, make them landings with a gentle slope.
Measuring the slope -
2
Start at the bottom.
Begin at a break in the slope, on firm ground. Dig a footing for the first riser and bury it well: it anchors everything above it.
The first riser dug in -
3
Set each riser on the one below.
Stone: the largest, squarest pieces you can move, each bearing firmly on the step below and the footing. Timber: pin each riser to the footing and to the step below. Keep every rise the same.
Risers stacked up the slope -
4
Fill and tamp each tread.
Fill behind the riser with 0–32 mm in thin layers, tamping each. Top with 50 mm of self-binding gravel (8.2) and compact.
Tamping a tread -
5
Tilt each tread to shed water.
Give each tread a slight crown or a tilt to one side. Water must not run far down the steps or collect on a landing.
A tread shedding water -
6
Turn the water off above the steps.
At the top, make a short dip or a water bar across the path at an angle of 45–60°, so water runs off to the side instead of down the steps.
A water bar above the steps
Specifications
| Part | Value | Source | Note |
|---|---|---|---|
| Rise, easy | 75–150 mm | Approved Document M | Path to a front door; uniform. |
| Going, easy | at least 280 mm | Approved Document M | Measured front to back. |
| Rise, trail | 150–200 mm | USDA Forest Service | |
| Tread, trail | 250–300 mm | USDA Forest Service | 254–305 mm in the source. |
| 2 × rise + tread | 635–686 mm | USDA Forest Service | Comfort rule. |
| Flight rise | max 1.8 m | Approved Document M | Between landings; landings at least 900 mm long. |
| Handrail | 3+ risers | Approved Document M | One side, 850–1000 mm above the pitch line. |
| Water bar angle | 45–60° | USDA Forest Service | To the path; mostly useless over 20 % gradient. |
Slopes
US Forest Service access routes: up to 1:20 (5 %) any length; 1:20–1:12 for at most 15 m between rests; 1:12–1:10 for at most 9 m; never over 1:10; rests at least 1.5 m long. Trail guidance for crusher fines: under 5 % where possible, never over 8 %. A US conservation standard keeps general walkways under 10 %. UK guidance: gravel is not suitable on steep drives, and permeable surfacing may not suit slopes over 1 in 20.
Water on slopes
Trail guidance turns water off the path with grade reversals every 6–15 m, each 3–5 m long, or with water bars set at 45–60° to the path, buried two-thirds deep and running at least 300 mm into the bank.
Buy at Gravelbase.co.uk
- Footing 0–32 mm
- MOT Type 1 Sub BaseType 1 ECO Blend
- Tread surface 0–8 mm
- Granite Dust 0-4 mm
Product names as Gravelbase.co.uk sells them, nearest to the size this guide uses.
Work it out for your job
Open the Steps and slopes calculator with the figures on this page filled in, and change them to fit your job.
Sources
- USDA Forest Service, Trail Construction and Maintenance Notebook: steps: rise about 150–200 mm, run 254–305 mm; twice the rise plus the tread 635–686 mm; build from the bottom at a break in grade; “Bury the first rock; it will act as an anchor”; pin timber steps; tamp the fill; crown or tilt each step; a grade reversal or drain dip at the top of the steps
- UK Government, Approved Document M, volume 1: dwellings (2015, with 2016 amendments): approach route at least 900 mm wide with a cross fall of at most 1 in 40; stepped approach with uniform rise 75–150 mm and going at least 280 mm; no flight rising more than 1800 mm; landings at least 900 mm long; a handrail on flights of three or more risers, 850–1000 mm above the pitch line
- USDA Forest Service, Accessibility Guidebook for Outdoor Recreation and Trails (outdoor recreation access routes): running slope up to 1:20; 1:20–1:12 for at most 15 m and 1:12–1:10 for at most 9 m between resting intervals; never over 1:10; resting intervals at least 1,525 mm long; cross slope at most 3 %
- USDA Forest Service, Trail Construction and Maintenance Notebook: surface water control: grade reversals 3–5 m long every 6–15 m; waterbars at 45–60° to the trail, two-thirds buried, at least 300 mm into the bank; “Waterbars are mostly useless for grades steeper than 20 percent”
- Building crusher fines trails (L. Bachensky, USDA Forest Service, via American Trails, 2019): crusher fines trails under 5 % where possible, never over 8 %
- USDA NRCS Vermont, Conservation Practice Standard 575: Trails and walkways (2021): general pedestrian trails “should generally not exceed 10 percent”
- UK Government (MHCLG and Environment Agency), Guidance on the permeable surfacing of front gardens (2009): gravel “Not suitable on steeply sloping drives”; permeable surfacing may not suit drives steeper than 1 in 20
- Paths for All and Scottish Natural Heritage, Lowland Path Construction Guide (2019): a path may meander or zigzag up steep slopes to reduce the gradient
Amounts: rough volumes for a step 1 m wide with a 150 mm rise and 350 mm tread; tread gravel at about 2.0 t/m³ as in 8.2. The slope table groups the sources above. The 150 mm rise in the worked rule sits where the two step types meet.
GLAREUM.NET · Aggregate Handbook