GLAREUM.NET›Calculators›Paving sand calculator

Paving sand calculator

Bedding sand, joint sand and the number of pavers or slabs for any area and any paver size.

Paving sand calculator

How it is worked out

Pavers per m² = 1 m² ÷ ((length + joint) × (width + joint)). The joints are the rest of the surface; joint sand = that share × paver thickness × the sand's weight.

A 30 mm bedding layer of sand takes about 50 kg per m². 200 × 100 × 60 mm pavers with 3 mm joints take about 4 kg of joint sand per m² (see 3.3 and 3.4).

Sources

  1. UFGS 32 14 13.13, Interlocking precast concrete unit paving (US Department of Defense unified facilities guide specification, 2019): a dense-graded base, within 10 mm under a 3 m straightedge; bedding sand screeded to an uncompacted average of 25 mm, left uncompacted and not walked on, and never used to fill low areas in the base; bedding sand to ASTM C33 with at most 1 % passing 0.075 mm; joint sand to ASTM C144 with at most 5 % passing 0.075 mm; joints 2–5 mm; gaps at edges at most 6 mm; at least three plate passes; no seating or joint filling within 1.5 m of an unrestrained edge; joint sand swept and vibrated until no more goes in; finished surface flush with or up to 6 mm above edges and drains
  2. ACT Government (Canberra), Standard specification for urban infrastructure works, section 12: segmental paving (2002): bedding never used for levelling; screed no further ahead than can be paved that day; joint sand dry when spread; laid joints 2–5 mm; plate fitted with a carpet or roller to protect the pavers; no compaction within 1 m of the working face
  3. Penn State University, CE 584 concrete course notes: aggregates: aggregate for normal concrete weighs 1,520–1,680 kg/m³
  4. NPTEL (Indian Institutes of Technology), soil mechanics worked examples: dry sand about 1,600 kg/m³
Paving sand calculator Find these materials near you →